Fairchild Air Force Base, 2011
ICON Materials is performing all deconstruction, dirt work and storm sewer work on the 13,000 foot long runway at Fairchild Air Force Base in Spokane, WA. ICON was responsible for the removal of all the old ashpalt and concrete. We then installed the water utilities and did all the dirt work and grading for the new runway.